Scaling of a ProjectWise System

Posted: March 12, 2013 in Performance
Tags: , , , ,

Since ProjectWise consists of several servers that need to work together, it is sometimes difficult to diagnose performance issues.   ProjectWise performance diagnosis usually fits into five different categories.  It is best to ensure that you have the “right size” system.  Consider the following:

  • CPU
  • File I/O
  • Network
  • Memory
  • Database

In general, most hardware has a three year life cycle around which you can plan a system.  This means that the hardware will be sufficient enough to perform with future versions of the software applications, such as the ProjectWise Integration Server, but also work with new operating systems that may be deployed over time.  In addition to the software requirements, the expected user load must be taken into consideration. Most companies that use ProjectWise will grow their usage over time.

The following chart shows how one Integration Server can be scaled to handle the load for up to 2000 connected users. It would be a best practice to include a second (or more) Integration Server, in either a cluster or network load balanced set up, to allow for failover and for spreading the load when you have more than a few hundred users or need more of a guaranteed uptime.  Keep in mind that these numbers are representative of a SELECTseries 4 Integration Server which is true 64bit.

ProjectWiseBlogIS

EJA

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s